Specifications:
|
| |
|
| |
Electrical
Systems: |
| |
Primary
12,470 volt system
- (9)
Primary transformers 12,470 volt to 208/120 volt ranging
from 1500KVA to 75 KVA
- 1000'
of new primary duct bank with 6000' of 15 KV cable
- Removal
of existing and installation of new 12,500' of 15 KV cable
|
| |
Gear:
- (3)
1600 amp Main Distribution Centers
- (1)
1200 amp Main Distribution Centers
- (2)
800 amp Main Distribution Centers
- (2)
600 amp Main Distribution Centers
- (3)
400 amp Main Distribution Centers
- (1)
600 amp Motor Control Center
- (103)
Panelboards
- (11)
Tvss units
- (108)
Disconnects
|
| |
Fixtures:
- 4085
New Fixtures
- Refurbish
all existing exterior fixtures
|
| |
Fire
Alarm System:
- 12
Fire Alarm Panels
- 2026
Fire Alarm devices (Pull Stations, Horn Base/Smoke Detectors
in each residence room, Smoke Detectors, Horn/Strobes, Strobes,
Heat Detectors and Duct Detectors)
- 70,000'
Fire Alarm Cable
The
Fire Alarm System from each building ties into a Main Delta
System at Gray Hall going through approximately 3000' of underground
tunnel.
|
| |
|
| |
Telephone/Data
System:
This
included the installation of 2,500' 600 pair cable and 1000'
100 pair cable through the underground tunnel system connecting
each building. Coupled with this telephone cable, a Fiber
Optic cable was looped between each building.
|
| |
|
| |
Devices
- 770
Telephone Outlets
- 807
Data Outlets
|
|
| |
Security
System:
Each
building had a Door Controller with a Card Reader for access
into the building.
15,700'
of G4000 Raceway was installed in the existing rooms for the
installation of 110 volt power receptacles, telephone, data
and TV outlets.
|
| |
|
| |
Rough-in
Conduit:
- (88,000)
1/2" EMT
- (70,000)
3/4" EMT
- (16,800)
1" EMT
- (12,300')
1 1/4" through 2" EMT
- (5,000)
2 1/2 through 4" EMT
- (67,000')
12-2 MC Cable
- (21,850')
12-3 MC Cable
- (6,000')
12-4 MC Cable
- (15,500)
12-6 MC Cable
|
| |
Conductors
installed in the raceway included:
- (718,500')
#14 through #10
- (38,000')
#8 through #1
- (13,230')
#1/0 through #4/0
- (14,050')
#250 through #500
Approximately
$1,150,000.00 of this project was completed from May 6 of
1999 through August 15, 1999 and the attended buildings opened
for occupancy at the beginning of the school semester.
|
 |
Letter
of Recommendation from the general contractor, Hensel Phelps. |
| |
|
 |
Letter
of Commendation from the client, UNC. |